SUNPP. Loading WFAs

On 31 October – 15 November, NFC STE staff took part in the scheduled loading of Westinghouse fuel in the SUNPP-3 core for Cycle 29.
The loading was done in the normal mode, and 29 WFAs were successfully loaded in the core.

« Back