Loading ZNPP-1

On 20 November – 11 December, NFC STE staff participated in the scheduled loading of the ZNPP-1 core for Cycle 31. The loading was completed in the normal mode, and the mixed core was successfully loaded with RWFAs and TVSAs.

« Back